[{"data":1,"prerenderedAt":28},["ShallowReactive",2],{"nr-en-us-data-centers-gas-plants-off-grid-power":3},{"slug":4,"title":5,"dek":6,"date":7,"time":8,"publishedAt":9,"updated":10,"updatedAt":10,"dateFmt":11,"updatedFmt":10,"kind":12,"tier":13,"author":14,"authorName":15,"topics":16,"tracker":10,"trackerLabel":10,"headlineStat":22,"image":23,"ogImage":24,"imageAlt":5,"csv":10,"minutes":25,"words":26,"html":27},"us-data-centers-gas-plants-off-grid-power","Over 100 gas plants planned: US data centers turn to their own power","In the US in particular, AI data centers are increasingly being built without a grid connection. The power is to come from their own gas turbines, which can be faster but raise concerns.","2026-11-26","16:18","2026-11-26T16:18:00+01:00","","November 26, 2026","analyse","standard","ideal-syka","Ideal Syka",[17,18,19,20,21],"Data centers","Energy","Gas power plants","USA","Climate","Over 100 planned gas power plants","\u002Fnewsroom\u002Fimg\u002Fus-data-centers-gas-plants-off-grid-power.webp","\u002Fog-nr\u002Fus-data-centers-gas-plants-off-grid-power.en.png",1,244,"\u003Cp>According to a report by t3n, which draws on an analysis by MIT Technology Review, AI data centers in the US are increasingly being built without a grid connection. The power is to come from their own gas turbines, meaning generators behind the electricity meter.\u003C\u002Fp>\n\u003Ch2>Why developers do this\u003C\u002Fh2>\n\u003Cp>According to the report, the main bottleneck is the connection to the power grid. Developers of large facilities in the United States must plan for long waiting times; until commissioning, it can take up to a decade, similar to Europe. Their own gas plants, by contrast, promise a faster start.\u003C\u002Fp>\n\u003Ch2>The concerns\u003C\u002Fh2>\n\u003Cp>According to t3n, this approach has consequences for residents and the environment. The report cites the SpaceX AI campus in Memphis as an example, which has used dozens of natural gas turbines since 2024, some apparently without permission. At the time of its setup the facility was rare and was closely examined by regulators; according to the source it is still the subject of ongoing legal disputes.\u003C\u002Fp>\n\u003Ch2>Classification\u003C\u002Fh2>\n\u003Cp>If the trend continues, it could noticeably change US energy infrastructure and therefore grids and climate targets. For German companies planning AI infrastructure, the news mainly signals that grid connection times are a central planning factor. Whether this can be transferred to European approval procedures is not clear from the available evidence.\u003C\u002Fp>\n\u003Ch2>Sources\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Ft3n.de\u002Fnews\u002Fueber-100-gaskraftwerke-geplant-warum-us-rechenzentren-auf-diese-strategie-setzen-1775049\">t3n\u003C\u002Fa>\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>\u003Cem>Editorially owned by \u003Ca href=\"\u002Fen\u002Fautor\u002Fideal-syka\u002F\">Ideal Syka\u003C\u002Fa>. Sources and method: \u003Ca href=\"\u002Fen\u002Fredaktion\u002F\">Newsroom &amp; method\u003C\u002Fa>. Tips and corrections: \u003Ca href=\"mailto:ai@i6eal.de\">ai@i6eal.de\u003C\u002Fa>.\u003C\u002Fem>\u003C\u002Fp>\n",1795707027430]